无码av高潮喷水无码专区线,欧美伦费免费全部午夜最新,丰满少妇在线观看网站,gv天堂gv无码男同在线观看

How to properly install the rock particles machine?
Rock particles machine prior to installation, the first reference to the packing list check the parts are complete and damage. The use of high strength bolts, nuts and washers must comply with GB1231-76 "steel with high strength hexagon bolt, large hexagon nuts, plain washers".
  2 reference to the rock particles, machine installation drawings for installation, chassis which support must be horizontally mounted on the foundation, the basis should have sufficient stiffness and strength to support the vibrating screen with all the dynamic load and static load.
  3 can be used to screen box trunnion lifting screen can not be linked directly to the exciter on the lifting of the entire sieve.
  Installation of rock particles, machine screen, make sure the screen box and hopper, trough a class of non-moving parts kept to a minimum 75mm gap between.
  Rock particles installation screen surface remain level, or about the spring seat and bearing pad of thin iron plates to adjust.
  Spring must be in a vertical spring fixator in the ear axis of the screen box.
  The shaker drive direction as, standing on the feed side, the face of the material flow direction, to observe the motor position, the left hand side to the left for the right to drive to the drive, right hand side. The shaker symmetrical design, both sides pulley. Replace the motor position to drive the direction of change around.
  Make sure the V-belt tension the full amount of the adjustment, two pulley end adjustment in a plane. Replacement of V-belts should be fully release the motor feet and easily placed on the duct tape round is not allowed with sticks or other objects to pry the V-belt, V belt tensioner force must be suitable for tape round must, in the first times to adjust the tension to run 48 hours, and then re-adjusted once.
  Before the trial must be by hand (or other method) rotating exciter. Flexible rotation, no jamming phenomenon, before starting the machine. Shaker and screen box links bolt for high strength bolts, not allowed to replace the ordinary bolt, fastening must be checked regularly, at least monthly check. Any one bolt loose, can lead to other bolt cut, causing damage to the screening machine.
  10 rock particles machines installed after the end of the adjustment, should be carried out not less than two hours no load test run, to smooth operation, no abnormal noise, rock particles, machine bearing the normal operating temperature should not exceed 75 ° C, the new exciter because a running-in process, it is likely the temperature is slightly higher, but after eight hours after the operation, the temperature should be stabilized, if the high temperatures continue, you should stop to check.
  11 users based on site usage, the eccentric block of rock particles by appropriate changes in quantity, adjust the size of the amplitude in order to achieve the desired screening effect.
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

主站蜘蛛池模板: 亚洲欧美日韩在线码| 欧美国产成人精品二区| 免费人成网站在线观看不卡| 久久精品视频在线看| 狂野av人人澡人人添| 亚洲亚洲精品av在线动态图| 玩弄丰满少妇人妻视频| 久久婷婷人人澡人人爽人人爱 | 国产欧美日韩综合精品一区二区 | 精品高潮呻吟99av无码视频| 精品一区二区成人精品| 国产久9视频这里只有精品| 青草青草久热精品视频观看| 无码国产精品一区二区免费虚拟vr| 人人妻人人澡人人爽欧美一区九九| 国内自拍视频一区二区三区| 国产在线不卡一区二区三区 | 无码国产成人午夜在线观看| 伊人久久综合色| 国产偷抇久久精品a片69| 一本大道久久东京热av| 欧美自拍亚洲综合图区| 日本强伦姧熟睡人妻完整视频| 久久久久久成人毛片免费看| 久久久噜噜噜www成人网| 色噜噜狠狠一区二区三区果冻| 久久亚洲sm情趣捆绑调教| 久久天天躁夜夜躁狠狠躁| 中文字幕日韩精品亚洲一区| 玩爽少妇人妻系列无码| 人妻老妇乱子伦精品无码专区| 伊人精品一本久久综合| 国产婷婷综合在线视频中文| 男人和女人高潮做爰视频| 中字幕视频在线永久在线| 久久久www成人免费无遮挡大片| 大桥未久亚洲无av码在线| 国产成年无码久久久久毛片| 妇女性内射冈站hdwwwooo| 亚洲日韩一区精品射精| 性色av无码专区一ⅴa亚洲|