Vacuum dryer debugging steps and the main points
Dwell vacuum dryer 5 debug steps
  After the vacuum level debugging, as follows:
  Open vacuum dryer power, the power indicator light (6090 and 6210 should be opened separately switch of the temperature control device) temperature control device, the power-on self-test, the PV screen display work indoor measurement temperature, the SV screen display factory set given temperature. AT & HEAT lamp should light on the temperature control device, said instrument into the heating working condition.
  Second, to modify the set temperature:
  Click temperature control instrument function key (SET); the PV screen displays the SP character after the the available key head button set temperature changes (6090 and 6210 type 2 and 3 meter should be set separately modify the following classes the same).
  2, after the modification is completed, press the SET button, PV screen display ST character set timer time. If you do not use the timer function, you still let ST = 0
  3, press the SET button, the PV-screen display studio temperatures, SV screen displays the set temperature. Instrument AT and HEAT lights, the instrument re-enter the warmed working state.
  4, the humidity of the working chamber vacuum dryer, the moisture will affect the performance of the vacuum pump, it is recommended that the string into a vacuum dryer / filter vacuum drier between the chassis and the vacuum pump.
  5, if the process of the vacuum drier article is necessary to add an inert gas such as nitrogen, should be specified in the contract, was equipped with an intake valve.
  Third, when the the work indoor temperature close to the set temperature, HEAT lamp suddenly bright flickered, said heating enters the PID regulator stage, instrumentation is sometimes measured temperature exceeds the set temperature, and is sometimes lower than the set temperature is a normal phenomenon. 1 ~ 2h studio into the thermostat state goods into the vacuum dryer stage again to be When measuring temperature close to or equal to the set temperature.
  Fourth, the desired temperature is low, the second set can be used, as desired working temperature of 70 ° C, the first set of 60 ° C for the first time, and so the temperature overshoot began to fall, and then the second set 70 ℃ This can reduce or even eliminate temperature overshoot, as soon as the thermostat state.
  When the vacuum dryer after use, turn off the power, accelerated cooling, purge valve was opened to the vacuum of 0 to resort to be about five minutes out of the box door.
  Vacuum dryer running after work, a total of 6:00, as follows:
  1, first disconnect the circuit and power source of the equipment, and then prepare the following equipment checks, record work.
  Good run-in equipment cleaning, lubricating, tightening, replace or repair the malfunctioning part and debugging, the best use of state equipment.
  Well and finishing equipment geometric precision, machining accuracy of the inspection records, and other functions of the test record.
  4, in the commissioning of the finishing equipment (including troubleshooting) records.
  5, the problem can not be adjusted, to analyze the reasons, from equipment design, manufacturing, transportation, storage, installation summarized.
  The equipment operation assessment conclusions, opinions on handling handle the transfer formalities, and indicate the personnel participating in the commissioning and date.
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

主站蜘蛛池模板: 亚洲伊人久久大香线蕉综合图片| 亚洲乱码日产精品bd在线下载| 男男车车的车车网站w98免费| 性无码专区一色吊丝中文字幕| 极品少妇一区二区三区四区 | 婷婷色婷婷开心五月四房播播久久| 欧洲免费一区二区三区视频| 中文字幕无码免费久久99| 在线成人| 亚洲综合欧美在线一区在线播放| 精品国产乱码久久久久夜深人妻| 69国产成人综合久久精品| 国产亚洲精品久久久久9999| 久久久久久久久免费看无码 | 亚洲精品午夜无码专区| 婷婷伊人久久大香线蕉av| 亚洲首页一区任你躁xxxxx| 国产乱人伦av在线无码| 亚洲欧美中文日韩v日本| 无套内射极品少妇chinese| 亚洲中亚洲中文字幕无线乱码 | 日本高清在线一区二区三区| 狠狠色综合7777久夜色撩人| 在厨房拨开内裤进入在线视频| 国产成人精品免费午夜app | 国产超碰人人做人人爱ⅴa| 色妞色视频一区二区三区四区| 亚洲国产精品久久久久秋霞小说| 亚洲欧美激情四射在线日| 久久伊人精品影院一本到综合| 国产熟女一区二区三区四区五区 | 鲁丝久久久精品av论理电影网| 日韩人妻不卡一区二区三区| 人妻激情偷乱一区二区三区| 国产精品线路一线路二| 亚洲毛片多多影院| 久久精品国产999久久久| 日本精品一区二区三区四区| 国产午夜毛片v一区二区三区 | 欧美大屁股bbbbxxxx| 天天躁日日躁狠狠躁超碰97 |