无码av高潮喷水无码专区线,欧美伦费免费全部午夜最新,丰满少妇在线观看网站,gv天堂gv无码男同在线观看

The universal grinder use regulations and swing particles machine maintenance
Universal grinder use regulations
  Universal grinder are hopper bucket outside of the following feed regulation flapper should adjust the flapper to the blanking size, according to the degree of friability of the material and the grinding fineness, indeed when the position and tighten .
  The universal grinder beneath the discharge port, if the discharge of the amount of material wind caused slightly spray material phenomenon, should be in a material bag plus port bundling material by Higuchi bag slowly spillover.
  Should be carried out before the first boot once empty running test, commissioning should be preceded by checking the universal grinder sites to confirm whether the universal grinder qualified.
  Universal grinder has a water-cooled, plus use should be used to avoid damage to the bearings.
  The universal grinder installation and debugging
  1. Fixed-gear Imperial the Imperial went bolts can.
  2 fold the Royal universal grinder bearings, first open cavity, the Royal derotation chainring or rotary knife, take away the maze and the center bearing cap, then Imperial to the outer end of the pulley and bearing cap, which launched both ends of the axial Imperial go to both ends of the bearing and shaft.
  Installation still keep the alignment of the the shaft cavity bush hole oil eye.
  Install universal grinder screen sieve circle close to the machine cavity shoulder tank, otherwise damage sieve circle when the door is closed.
  5. Making universal grinder sieve ring, mesh expand the length should be the root noted in the sieve circle shoulder sized screen damage manufacturers should be equipped to do.
  Install universal grinder screen: the two sieve Circle merged alignment mark and then sieve into within the sieve circle, such as the mesh too tight, then push out the screen inward curved into can.
  Rock particles maintenance methods:
  (1) Swing particle the machine lubrication: lubrication cycle refueling time: ① general parts per run three days; ② The Rolling 1 # calcium based grease every 3 months.
  (2) rock particles maintenance
  1) maintenance cycle: (1) motor: checked once a month; ② each class using the time of the rock particles the machine overall seized enterprises.
  2) maintenance of content:
  (1) periodically check the reliability of the insulation resistance of the rock particles machine electrical system components and the control loop and then zero, to ensure the safe use of electricity;
  ② check swing particles machine parts on a regular basis (monthly - the times), check whether the active portion of the worm, worm, bearings and other rotating flexible and wear, discovered defects should be repaired in time, may not continue to use;
  ③ the transmission part of the rock particles should all drive, refueling time, add the midway may be part of the operation;
  ④ worm gear box to be long-term storage of oil, the oil surface height worm gear fully immersed in oil, the continuous use of the aircraft, the required oil change every three months;
  ⑤ before rocking operation of the pellet machine idling confirm normal run, well-oiled, before normal operation;
  When you and ⑥ swing particles machine after use or lockout time, you should remove the rotating drum cleaning brush cleared the remaining flour sub in the bucket, and then properly installed, ready to work for the next;
  (7) if a longer time to discontinuation must swing the particle machine clean.
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

主站蜘蛛池模板: 国产精品无码制服丝袜网站| 天天澡天天揉揉av无码| 免费看一区二区三区四区| 国产成人精品日本亚洲第一区| 亚洲丁香婷婷综合久久| 天天综合亚洲色在线精品| 免费观看又色又爽又湿的软件 | 无码人妻一区二区中文| 国语自产精品视频在线看| 日本一区午夜艳熟免费| 麻豆久久久9性大片| 亚洲人成电影综合网站色www | 国产精品va在线观看h| 天天做天天大爽天天爱| 国产精品熟女高潮视频| 久久伊人精品一区二区三区| av人摸人人人澡人人超碰妓女| 亚洲欧美人成视频一区在线| 欧美中文亚洲v在线| 男人的天堂亚洲一线av在线观看| 无码免费的毛片基地| 国产自产对白一区| 国产精品96久久久久久| aⅴ亚洲 日韩 色 图网站 播放| 18禁黄无遮挡网站| 亚洲综合成人婷婷五月在线观看 | 妇女性内射冈站hdwww000| 蜜臀少妇人妻在线| 丰满人妻一区二区三区无码av | 国产精品无码电影在线观看| 亚洲欧洲∨国产一区二区三区| 亚洲图片另类图片激情动图| 亚洲精品无码国产| 亚洲精品国产一区黑色丝袜| 免费看小12萝裸体视频国产| 国产免费久久精品99久久| 久久久774这里只有精品17| 熟女少妇精品一区二区| 人人人爽人人爽人人av| 久久青青草原一区二区| 亚洲成av人片在一线观看 |