无码av高潮喷水无码专区线,欧美伦费免费全部午夜最新,丰满少妇在线观看网站,gv天堂gv无码男同在线观看

The universal grinder use regulations and swing particles machine maintenance
Universal grinder use regulations
  Universal grinder are hopper bucket outside of the following feed regulation flapper should adjust the flapper to the blanking size, according to the degree of friability of the material and the grinding fineness, indeed when the position and tighten .
  The universal grinder beneath the discharge port, if the discharge of the amount of material wind caused slightly spray material phenomenon, should be in a material bag plus port bundling material by Higuchi bag slowly spillover.
  Should be carried out before the first boot once empty running test, commissioning should be preceded by checking the universal grinder sites to confirm whether the universal grinder qualified.
  Universal grinder has a water-cooled, plus use should be used to avoid damage to the bearings.
  The universal grinder installation and debugging
  1. Fixed-gear Imperial the Imperial went bolts can.
  2 fold the Royal universal grinder bearings, first open cavity, the Royal derotation chainring or rotary knife, take away the maze and the center bearing cap, then Imperial to the outer end of the pulley and bearing cap, which launched both ends of the axial Imperial go to both ends of the bearing and shaft.
  Installation still keep the alignment of the the shaft cavity bush hole oil eye.
  Install universal grinder screen sieve circle close to the machine cavity shoulder tank, otherwise damage sieve circle when the door is closed.
  5. Making universal grinder sieve ring, mesh expand the length should be the root noted in the sieve circle shoulder sized screen damage manufacturers should be equipped to do.
  Install universal grinder screen: the two sieve Circle merged alignment mark and then sieve into within the sieve circle, such as the mesh too tight, then push out the screen inward curved into can.
  Rock particles maintenance methods:
  (1) Swing particle the machine lubrication: lubrication cycle refueling time: ① general parts per run three days; ② The Rolling 1 # calcium based grease every 3 months.
  (2) rock particles maintenance
  1) maintenance cycle: (1) motor: checked once a month; ② each class using the time of the rock particles the machine overall seized enterprises.
  2) maintenance of content:
  (1) periodically check the reliability of the insulation resistance of the rock particles machine electrical system components and the control loop and then zero, to ensure the safe use of electricity;
  ② check swing particles machine parts on a regular basis (monthly - the times), check whether the active portion of the worm, worm, bearings and other rotating flexible and wear, discovered defects should be repaired in time, may not continue to use;
  ③ the transmission part of the rock particles should all drive, refueling time, add the midway may be part of the operation;
  ④ worm gear box to be long-term storage of oil, the oil surface height worm gear fully immersed in oil, the continuous use of the aircraft, the required oil change every three months;
  ⑤ before rocking operation of the pellet machine idling confirm normal run, well-oiled, before normal operation;
  When you and ⑥ swing particles machine after use or lockout time, you should remove the rotating drum cleaning brush cleared the remaining flour sub in the bucket, and then properly installed, ready to work for the next;
  (7) if a longer time to discontinuation must swing the particle machine clean.
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

主站蜘蛛池模板: 免费 黄 色 人成 视频 在 线| 国产成人亚洲日韩欧美| 色狠狠色狠狠综合天天| 亚洲旡码av中文字幕| 国产精品中文久久久久久久| 亚洲国产欧美在线观看片| 亚洲欧洲无码一区二区三区| 午夜无码区在线观看亚洲| 国产精品人妻| 精品无码久久久久久久久久| 精品国产aⅴ无码一区二区| 人妻耻辱中文字幕在线bd| 欧美牲交40_50a欧美牲交aⅴ| 国产精品久久综合免费| 亚洲色无码中文字幕yy51999| 欧美裸体xxxx极品少妇| 又爽又黄又无遮挡的激情视频| 天堂v亚洲国产v第一次| 国产99久60在线视频 | 传媒| 日本体内she精高潮| 无码伊人久久大杳蕉中文无码 | 国产看黄a大片爽爽影院| 久久综合激激的五月天| 日本久久精品一区二区三区| 欧美亚洲色综久久精品国产| 国语自产精品视频在线区| 无码人妻啪啪一区二区| 手机成亚洲人成电影网站| 亚洲人成网站在线观看播放| 国产成人亚洲精品无码av大片 | 色噜噜狠狠狠狠色综合久一| 国产美女视频免费的| 人妻去按摩店被黑人按中出| 脱岳裙子从后面挺进去在线观看| 国产女女精品视频久热视频| 精品日产一卡二卡| 亚洲午夜福利av一区二区无码| 亚洲欧美日韩综合久久久久| 国产精品亚洲综合一区在线观看| 久久96热在精品国产高清| 国产精品99久久久久久www|